Montag, 26. Januar 2015







Connecting the pipes: The construction on the first aquaponic system in Sierra Leone is ongoing. The plumber has connected the fish tanks with the 3-step filter array. The siphons are now connected to the grow beds to have a constant flow of water throughout the system. We expecting the pumps and the air compressors to arrive within the next days. Once the construction is completed, the system will become operational.

Keine Kommentare:

Kommentar veröffentlichen